WE WILL START CONSTRUCTION ON MAIN STREET BETWEEN  1 STREET AND THIRD STREET WE'LL DO THAT BY   [00:00:05] STARTING WORK ON THE SOUTH SIDE OF THE ROAD AND TO  DO THAT WE'LL HAVE TO SHIFT THE EASTBOUND TRAFFIC   OVER TO THE NORTH SIDE OF THE ROAD TO CREATE THE  ROOM WE NEED ON THE NORTH SIDE WE'LL REMOVE THE ON   STREET PARKING AND THAT WILL GIVE US THE ROOM TO  HAVE A LANE IN EACH DIRECTION IT'LL CONTINUE EAST   ALL THE WAY TO NORTH COUNTY SO IT'S GOING TO BE  THIS WAY FOR THE BETTER PART OF THE NEXT YEAR MAIN   STREET WILL NEVER BE CLOSED WE WILL ALWAYS HAVE  AT LEAST ONE LANE IN EACH DIRECTION FOR THE ENTIRE   OF CONSTRUCTION WHILE YOU'RE DRIVING THROUGH  MAIN STREET DURING CONSTRUCTION SLOW DOWN   PAY ATTENTION THE MAIN STREET CONSTRUCTION IS  EXPECTED TO LAST UNTIL THE EARLY PART OF 2026 * This transcript was compiled from uncorrected Closed Captioning.